Glossary
UK subcontracting terms explained: From applications to retentions.
Plain-English definitions of the terms UK subcontractors deal with every week, and where each one shows up in SubbieNow.
Checked 20 November 2026. Legal and tax terms are summaries, not advice.
- Aftercare (customer care)
Work to put right defects reported after a home is occupied, usually requested by the housebuilder’s customer care team.
In SubbieNow: Customer care jobs have a calendar, a per-site list, fault codes, colour categories and forms with photo evidence.
- Application for payment
A subcontractor’s claim for the value of work done (and materials on site) up to a date, sent to the contractor so the next interim payment can be valued. Housebuilders usually expect applications on a fixed monthly cycle.
In SubbieNow: Sales Applications are built from build stages, sales extras, variations and contra charges, and export as a document set.
- Build stage
A step in the construction sequence (for example first fix, second fix, final) used to programme work, order materials and value applications.
- Construction Industry Scheme (CIS)
HMRC’s scheme under which contractors deduct tax from payments to subcontractors: 20% for registered subcontractors, 30% for unregistered ones, and nothing for those with gross payment status. Deductions apply to the labour element, not materials.
- Consumables
Low-value items used up on site, such as fixings, sealants, blades and PPE, usually ordered at site level rather than per plot.
- Contra charge
A deduction a contractor makes from a subcontractor’s payment for costs it says the subcontractor caused, such as damage, cleaning or rework by others.
In SubbieNow: Contra charges are recorded against the site and included in sales applications, so they are visible rather than a surprise.
- Dayworks
Work paid at agreed hourly labour rates plus materials and plant, usually because it cannot be measured or priced in advance. Dayworks sheets should be signed off on the day.
- Defects period
A period after completion (often 12 months on contracts, and the first two years of a new-home warranty for the housebuilder) during which defects must be put right. Also called the defects liability or rectification period.
- Final date for payment
The last day by which the notified sum must be paid. If the contract does not set it, the Scheme for Construction Contracts makes it 17 days after the due date.
- First fix
Work done before walls are boarded or plastered: pipework, cables, back boxes, studwork and carcassing.
- Gang
A team of operatives that works together, often moving between plots and sites.
- Gross payment status
CIS status that lets a subcontractor be paid without deductions. From 6 April 2026 HMRC can cancel it immediately where a business knew or should have known a payment was connected to fraud, with a five-year wait to reapply.
- House type
A standard house design used across a site (for example a three-bed semi). Plots of the same house type share drawings, materials and labour, which makes forecasting and pricing repeatable.
In SubbieNow: House types carry build stages, sub-types, materials and labour items that plots inherit.
- Measured works
Work valued by measuring the quantity completed (per plot, metre, square metre or item) against agreed rates, rather than as a lump sum.
- Pay less notice
The notice a payer must give if it intends to pay less than the sum in the payment notice (or the subcontractor’s default payment notice). Where the contract is silent, the Scheme for Construction Contracts requires it no later than 7 days before the final date for payment.
- Payment notice
Under the Construction Act, the notice stating the sum the payer considers due and how it was worked out. It must be given no later than 5 days after the payment due date, even if the sum is zero.
- Plot
An individual house or unit on a housing site, usually numbered. Most housebuilder work is programmed, ordered and paid plot by plot.
In SubbieNow: Each plot has its own details, build stages, materials, labour items and customer care history.
- Plot-level P&L
Profit and loss worked out for each plot (or house type) rather than only for the whole business or site, so loss-making plots and stages are visible early.
- Practical completion
The point at which the works are complete apart from minor items and can be handed over. It usually triggers the release of the first half of retention and the start of the defects period.
- Pre-order
Ordering materials ahead of the programme so they arrive for the right plot and stage.
- Price submission (tender)
The prices a subcontractor submits for a site or package before it is awarded, which later become the basis of valuations.
- Programme
The schedule of when each plot and stage will be worked on. Housebuilders’ programmes drive when subcontractors need gangs and materials on site.
In SubbieNow: Programme and Programme Calendar views with filters, pre-orders and a programme movement report.
- Purchase order (PO)
A formal order to a supplier for materials, with a reference used to match deliveries and invoices.
In SubbieNow: Purchase orders are generated from approved orders and emailed to supplier branches.
- Retention
A percentage of each payment (commonly 3 to 5%) held back as security against defects. Typically half is released at practical completion and the rest at the end of the defects period. The Commercial Payments Bill, before Parliament in 2026, proposes to ban cash retentions in construction contracts.
- Sales extras
Options or upgrades a home buyer pays the housebuilder for (for example extra sockets, upgraded kitchens or flooring), which the subcontractor then installs and charges for.
In SubbieNow: Sales extras are set up per client and site and can be added to sales applications.
- Second fix
Work done after plastering: fitting sanitaryware, radiators, sockets, switches, doors, skirting and kitchens.
- Snagging
Finding and fixing small defects before handover or soon after a buyer moves in.
- Valuation
The contractor’s or quantity surveyor’s assessment of how much of an application is due. Differences between the application and the valuation are where most payment disputes start.
In SubbieNow: Work submissions, variations and applications sit on the same plot records, so you can show the evidence behind every line.
- Variation
A change to the work in the original contract or drawings: extra work, omitted work or a change in specification. Variations must be instructed and recorded to be valued and paid.
In SubbieNow: Variations are created on site or in the office with images, materials and labour, and flow into applications.
- VAT domestic reverse charge
Since 1 March 2021, for standard and reduced-rate building services reported under CIS between VAT and CIS-registered businesses, the customer (not the supplier) accounts for the VAT to HMRC. It does not apply to zero-rated work (such as most construction of new homes), or to supplies to end users or intermediary suppliers.